Projects

icon11
Reliable marine work

Top Marine Projects in Egypt Powered by Straight Line

At Straight Line, we are proud to have played a key role in several major marine projects across Egypt, delivering efficient and high-quality solutions in dredging, port construction, offshore drilling, and rig handling. Below is an overview of our completed and ongoing marine operations:

1. Construction of Marine Fish Cage Units Location: Al-Tafraa – East Port Said Duration: 2017–2018 Marine construction project for aquaculture infrastructure.
2. Dredging & Restoration – Lake Manzala Duration: 2019–2020 Environmental dredging to restore ecological balance and improve water flow.
3. Western Breakwater Construction – Damietta Port Duration: 2020–2021 Construction and efficiency upgrades for western and eastern breakwaters.
4. International Marina Construction – El Alamein Location: Sidi Abdel Rahman Village Duration: 2020–2021 Luxury marina development supporting regional tourism and yacht services.
5. Multi-Purpose Terminal – Alexandria Port Area: 562,000 m² | Wharfs: 55, 62 Year: 2020 Infrastructure work for container and cargo handling.
6. Wharf Dredging – Ain Sokhna Port Year: 2020 Dredging for increased depth and vessel access at the third wharf.
7. Rig Docking – ADM VIII Location: Suez Floating Dock Duration: 2022–2023 Docking and servicing of offshore drilling rig.
8. Red Sea Oil Drilling Projects Locations: Ras Shuqair, Ras Ghareb, Jabal Al-Zeit, Abu Zinema Duration: 2021–Present Support for offshore rig operations.
9. Offshore Development Wells – NIDOCO 9 & 10 Duration: 2022–2023 Drilling and support services.
10. Dredging – Al-Arish Port Duration: 2022–2023 Harbor basin expansion and deepening.
11. Multi-Purpose Wharf – Safaga Port Specs: 550m length | 17m depth Duration: 2022–2023 Construction for container and general cargo services.
12. Development Drilling – WEB Offshore Wells Year: 2023 Offshore wells WEB–NW, WE–NE, WE–SE, WEB–SW.
13. Offshore Exploration – YAKOOT IX Year: 2023 Drilling of exploration well in deep waters.
14. Mobile Offshore Drilling Unit – ADMARINE 260 Event: Suez Canal Transit Date: 17 August 2023 Towed from Red Sea to Mediterranean by SCA tugs at lowest cost.

Marine Projects in Egypt

Dredging Services Egypt

Offshore Drilling Egypt

Reliable Marine Contractor Egypt

Port Construction Company Egypt